Tuesday, October 21, 2008

Product

What i have understand from this 3rd lecture is that product must contains all the following elements:

  • form-space
  • nodes-paths
  • illusion

And all the elements are related with each other and it start with a form. A form must contains all the following attributes:





Picture From: http://www.hbp.usm.my/1b/RAG132/2008/L3product.htm





SPACE has a relationship with a NODE-PATH..



A node-path will combine with each other and will produce a SPACE. As example, we can see from the picture below:


Node is combine with a path and it produce a SPACE..



From the lecture, I also understand that product also can be a illusion..


Illusion is defined as a perception, as of visual stimuli (optical illusion), that represents what is perceived in a way different from the way it is in reality

Source: http://dictionary.reference.com/browse/illusion

Monday, October 20, 2008

SITE-SCALE

To be very honest actually in the second lecture i dont really get what my lecturer had tought us..The only thing that i know is there are 7 scales that we need to know and understand which is..

  1. Object
  2. Interior
  3. Building
  4. Premise
  5. Urban
  6. Region
  7. Global

OBJECT

-anything that is visible or tangible and is relatively stable in form

INTERIOR

-being within; inside of anything; internal; inner; further toward a center

BUILDING

-a relatively permanent enclosed construction over a plot of land, having a roof and usually windows and often more than one level, used for any of a wide variety of activities, as living, entertaining, or manufacturing

PREMISE

-a building together with its grounds or other appurtenances

URBAN

-of, pertaining to, or designating a city or town

REGION

-a district without respect to boundaries or extent, an administrative division of a city or territory

GLOBAL

-pertaining to the whole world; worldwide; universal, involving the entire earth; worldwide.

*source from http://dictionary.reference.com/

Thursday, October 2, 2008

PRODUCTION OF THE BUILT ENVIRONMENT PEOPLE & PROCESS

Building industry plays important role in contributing services and housing. The condition of our built environment affects performance of different sector.


BUILDING INDUSTRY

THE PROFILE is unique and flexible
The relationship in each project is a new undetailing with temporary of diverse group of local actors.
Low level of capital investment whule labour investment is high.

ACTOR
  • The people in the building industry.
  • Owner of a land or building.
  • Professional such as designers and consultant (we are).
  • Goverments agencies and local authorities.
  • Contractors and sub-contractors.
  • Suppliers
  • Lending and insurans intitutionals
  • End users
  • Indirect participants.

OWNER

There are 2 types of owner :

  1. Public Owner- such as Federal goverment
  2. Private Owner- major contributors in Malaysia building industry implementing project in house, commercial, tourism etc.

OBJECTIVES OF OWNERS

Time-very important thing in construction industry because every second is about money. Early project completion is of high priority. They also do not accept excuses.

Cost- to ensure low development cost

Quality- to achive value for money

ROLE OF OWNER

Decide the best approch of development to reach the objectives of the organization. They also obtain a continuousand sufficient financial source to carry out and complete the development. Thus, they also monitoring the overall development process to ensure quality product to capture positive and high market demand.

DESIGNERS

The person who design the building or surrounding such as interior design who is concern on the design of the internal space and emphasizing the interection between.

CONSULTANTS

Provide specialized knowledge skills and services to supplement those designers such as structural and civil engineers, quantity surveyor, or land surveyor.

OBJECTIVES

To ensure and safeguard the public health, welfare and safety.futhermore they functional as administer building codes that established minimum standards for development and construction based on

  • Uniform Building By Laws (UBBL) 1984
  • Urban and Regional Planning Act 1974

Approval are to be obtain from the local authorities before and after cimmencement of work at stage of the development process

  • sub-division approval
  • planning approval
  • building approval
  • start work permit
  • final inspection
  • cetificates of fitness-CFO
  • certificates of completion compliance (CCC)

CONTRACTORS

Main contractorss- individual or organization who undertakes to carry out the complete development or construction works according to the specifications documented in the tender and contract documents.

Personnel and Site Workers

  • site manager
  • clerk of work
  • skilled worker
  • semi-skilled worker
  • construction workers

All the contractors are responsible to register with CIDB (Construction Industry Development Board Malaysia)

USERS

Owner or End users

Objective owner

  • durability
  • easy and low maintenance

Objectives end users

  • comfort and safety
  • personalized space
  • privacy

CONCLUSION

Building industry is unique, massive, and complex. They involve wide knowledge on the market, demand and supply and property intake.


ELEMENT OF PRODUCTION

Element of Production consist of :

  1. Intention (Niat)
  2. Act (Laku)
  3. Actor (Pelaku)
  4. Rule (Aturan)
  5. Site (Tapak)
  6. Product (Hasil)

INTENTION

Intention always accompanied with knowledge which we gain by listening, seeing and use our heart and mind to understand, use our head to think which are going to produce a product of certain act.

ACT

The act which are going to do individually or in a group.

ACTOR

A person who is going to do the act which maybe an individual or an institutional.

RULE

A regulation, a believe, custom, man-made or natural. An ideology or isme which decide where is right or wrong by individual perception towards something. There are variety of isme that we can explore.

Such as :

  • Alturism- not right or not wrong
  • Cynicism- all things are wrong
  • Relativism- all things are right
  • Taoisme- throw away lies, the thruth will showed up
  • Truth-seekerisme -must find the truth

SITE

A real site which can be a land, floor, table, paper. the place that we are going to produce or do something on it.

PRODUCT

The thing that accomplished by an actor who have intention to do it which is something that physical, mental or spiritual.

Saturday, September 27, 2008


Pixel Code Graphics

Thursday, September 18, 2008

DOME?? NO DOME..

What should we do if our dome consider as no dome??
Shall we rebuilt the dome or just stay the way there are..
Is there any problem if we change the dome right now..
do it affect our marks??

Tuesday, September 16, 2008

DOME'S DAY

THE PROGRESSION DURING THE DOME'S DAY
Just after reporting the team,we are ready to do our job.

The participants stanby to report their group.

Our leader give some briefing before build up the dome.

Everyone plays their role in accomplish the job.

Zaki is tightening the joint to make it more stable.

Elias is tightening the joint also.

Enjoying the day.

Syazwan looked focus in doing his job.

Fadilah adjusting the middle column.

This is our product.

The dome can acommadate for 5 person and more.










REAL CONSTRUCTION (DOME)

REAL CONSTRUCTION
(DOME)
Intention

From our discussion, our team has select ‘Just Do It’ as our motto for our group. We choose this slogan as our group intention because we believe that we can do anything that we think we want as long it is not illegal. From this domes project, we expose about the dome structure and we learn how to do it.
Rules

- Team members at least one from different major.
- Lifespan not more than 12 months
- Link : no need to link with other domes I.e. Independent
- Zero cost
- Packaged
- recyclable
- Prefabricated
- Accommodate 5 person
- Carryable by 3 person
- Assemble in 30 minutes only by team members
- Show team identity
Actor

Our group members are from five different major which are architecture, planning, quantity surveying, construction management, and interior design. All of us have played our role in completing the project. The roles are as below : -
1) Architect : designing and furnishing the dome.
2) Planner : plan the strategy on how to build up the dome.
3) Quantity surveyor : calculating all the measurement of the materials in producing the dome.
4) Construction manager : ensure the progressions of the project are in the right path and smooth.
5) Interior designer : co-operate with architect in designing and furnishing the dome.

Act

First, we were discussing about the dome that we were going to produce and then deciding about the material that will be used. We also were looking for the identity of our team. From the discussion we have concluded that we were going to produce is 1V dome with radius 3 feet or 0.92m and 2.27m height. The material that we used is trouncing pipe
and had been sponsored by one of our group member’s family.

Product

We were producing 1V geodesic dome which is the simplest dome out of all. Geodesic means a straight line on a plane or an arc of a great circle on a sphere. The measurement of the dome are as listed below : -
Radius : 0.92m
Height : 2.27m
To build the dome we have used different size of trouncing pipes. We have eight pieces pipes length 1.83m each, 4 pieces pipes length 1.63m and some more. We also use some connectors to join the pipes. The shape of our dome is square at the base and pyramid shape at the above. It can accommodate more than five people and it is light so we can carry it.

Site

The site that has been fixed for us is situated at HBP Minden Valley.
Our lot is lot number 34 which quit far from the HBP studio.
*this report might similar with my another group members:

Monday, September 15, 2008

Convex 08

USM 37TH CONVO 2008
Event to Oval : The Production of a Build Environment
Intention : Add content to your virtual site
Act : Document changes on USM oval
Rule : Use production model
Product : Photo blog
Some services booth at convex 08.
People looking around at the convex 08.

This booth offers variety of gifts and flowers for customer.


The main stage of Convex 08 which situated in the middle of the site.

The day after convex 08, the site was cleaned up.


There is still a lots of rubbish after the Convex O8.





 
Blogger Templates by Wishafriend.com