Saturday, September 27, 2008


Pixel Code Graphics

Thursday, September 18, 2008

DOME?? NO DOME..

What should we do if our dome consider as no dome??
Shall we rebuilt the dome or just stay the way there are..
Is there any problem if we change the dome right now..
do it affect our marks??

Tuesday, September 16, 2008

DOME'S DAY

THE PROGRESSION DURING THE DOME'S DAY
Just after reporting the team,we are ready to do our job.

The participants stanby to report their group.

Our leader give some briefing before build up the dome.

Everyone plays their role in accomplish the job.

Zaki is tightening the joint to make it more stable.

Elias is tightening the joint also.

Enjoying the day.

Syazwan looked focus in doing his job.

Fadilah adjusting the middle column.

This is our product.

The dome can acommadate for 5 person and more.










REAL CONSTRUCTION (DOME)

REAL CONSTRUCTION
(DOME)
Intention

From our discussion, our team has select ‘Just Do It’ as our motto for our group. We choose this slogan as our group intention because we believe that we can do anything that we think we want as long it is not illegal. From this domes project, we expose about the dome structure and we learn how to do it.
Rules

- Team members at least one from different major.
- Lifespan not more than 12 months
- Link : no need to link with other domes I.e. Independent
- Zero cost
- Packaged
- recyclable
- Prefabricated
- Accommodate 5 person
- Carryable by 3 person
- Assemble in 30 minutes only by team members
- Show team identity
Actor

Our group members are from five different major which are architecture, planning, quantity surveying, construction management, and interior design. All of us have played our role in completing the project. The roles are as below : -
1) Architect : designing and furnishing the dome.
2) Planner : plan the strategy on how to build up the dome.
3) Quantity surveyor : calculating all the measurement of the materials in producing the dome.
4) Construction manager : ensure the progressions of the project are in the right path and smooth.
5) Interior designer : co-operate with architect in designing and furnishing the dome.

Act

First, we were discussing about the dome that we were going to produce and then deciding about the material that will be used. We also were looking for the identity of our team. From the discussion we have concluded that we were going to produce is 1V dome with radius 3 feet or 0.92m and 2.27m height. The material that we used is trouncing pipe
and had been sponsored by one of our group member’s family.

Product

We were producing 1V geodesic dome which is the simplest dome out of all. Geodesic means a straight line on a plane or an arc of a great circle on a sphere. The measurement of the dome are as listed below : -
Radius : 0.92m
Height : 2.27m
To build the dome we have used different size of trouncing pipes. We have eight pieces pipes length 1.83m each, 4 pieces pipes length 1.63m and some more. We also use some connectors to join the pipes. The shape of our dome is square at the base and pyramid shape at the above. It can accommodate more than five people and it is light so we can carry it.

Site

The site that has been fixed for us is situated at HBP Minden Valley.
Our lot is lot number 34 which quit far from the HBP studio.
*this report might similar with my another group members:

Monday, September 15, 2008

Convex 08

USM 37TH CONVO 2008
Event to Oval : The Production of a Build Environment
Intention : Add content to your virtual site
Act : Document changes on USM oval
Rule : Use production model
Product : Photo blog
Some services booth at convex 08.
People looking around at the convex 08.

This booth offers variety of gifts and flowers for customer.


The main stage of Convex 08 which situated in the middle of the site.

The day after convex 08, the site was cleaned up.


There is still a lots of rubbish after the Convex O8.





 
Blogger Templates by Wishafriend.com